7V Solar Ranch
Muldoon, TX
The entire project lasted six months, and throughout those six months, 351,288 solar modules were unloaded and installed across three properties on 4,000 acres. In one day, the Keeley team installed over 9,600 modules. With 130 craft professionals on site, Keeley was able to control schedule, budget, quality, and safety. Keeley completed the project on-budget and ahead of schedule with ZERO safety incidents. This project allowed our team to learn more about the solar industry and what is needed to ensure proper, safe installation of solar equipment and technology. “We are blown away by Keeley’s ability to complete this project so quickly. We are looking forward to working with the Keeley team in the future.” -Solar Partner
7V Solar Ranch
Muldoon, TX
The entire project lasted six months, and throughout those six months, 351,288 solar modules were unloaded and installed across three properties on 4,000 acres. In one day, the Keeley team installed over 9,600 modules. With 130 craft professionals on site, Keeley was able to control schedule, budget, quality, and safety. Keeley completed the project on-budget and ahead of schedule with ZERO safety incidents. This project allowed our team to learn more about the solar industry and what is needed to ensure proper, safe installation of solar equipment and technology. “We are blown away by Keeley’s ability to complete this project so quickly. We are looking forward to working with the Keeley team in the future.” -Solar Partner
LOOKING FOR A CONSTRUCTION PARTNER?
You Deserve a Keeley'n
Thank you for contacting us.
We will get back to you as soon as possible.
We will get back to you as soon as possible.
Oops, there was an error sending your message.
Please try again later.
Please try again later.